History :: Buyang Industry
한국어 日本語 Русский язык CONTACT
Company Products & Technologies Customers Support


Company

 Overview 
 History 
 Organization 
 HSE 
 Quality Assurance 
 Location 
 Contact 
 Buyang CI 

History

Domestic Porjects



Global Porjects



2019 6 NEW SPM #2 (Daewoo E&C) - Concrete Weight Coating
2019 1 Australia West Angelas Deposit C&D Gas Pipeline Realignment Project (Edgen Murray) - Concrete Weight Coating
2018 11 Australia North East Gas Interconnect (NEGI) Pipeline Project (Marubeni-itochu) - Concrete Weight Coating
2017 10 Bahrain, Bahrain LNG Import Terminal Project (GS E&C) ? Concrete Weight Coating
2016 8 Kuwait Al-Zour New Refinery Project(NRP) (SK E&C, Hyundai Construction, Saipem) - Concrete Weight Coating
2015 12 Korea Ulsan Buoy Relocation (SK E&C) - Concrete Weight Coating
2014 5 Vietnam Nghi-Sohn Refinery & Petrochemical Complex Project (SK E&C) - Concrete Weight Coating
2013 4 Taiwan CPC Project (Van Oord) - Concrete Weight Coating
2012 9 Oman Musandam Project (Hyundai Engineering) - Concrete Weight Coating
2012 9 S-Oil Onsan Crude Oil Offloading Facility (Daewoo E&C) - Concrete Weight Coating
2010 10 Delivered to Shin-Wolsong Nuclear Power Plant Unit 1 and 2 Project (Daewoo E&C) - PCCP
8 Delivered to Shin-Gori Nuclear Power Plant Unit 3 and 4 Project (Doosan Heavy Industries & Construction) - PCCP
3 Gyungin Waterway Electric Culvert Underground Construction (Hyundai E&C) - Jacking Pipe
2009 5 Sri Lanka Colombo Port Expansion Project (Hyundai E&C) - Concrete Weight Coating
5 Delivered to Shin-Gori Nuclear Power Plant Unit 1 and 2 Project (Hyundai E&C) - PCCP
3 Won the Contract of Shin-Gori Nuclear Power Plant Unit 3 and 4 Project (Doosan Heavy Industries & Construction) - PCCP
2008 4 SK Crude Oil Offloading System Project (SK E&C, SK Energy) - Concrete Weight Coating
2007 7 Vietnam Ho Chi Minh Sewage Pumping Station Project (Rotem) - Cement Lining
5 Israel Haifa Bay Project (Dong Yang Steel Pipe, DNV, PEI) - Concrete Weight Coating
2 Won the Contract of Shin-Wolsong Nuclear Power Plant Unit 1 and 2 (Daewoo E&C) - PCCP
2006 12 Increased capital by 1 billion won (Total capital: 2.6 billion won)
12 Wonju Branch was founded following the merger with Guirae Ascon Co., Ltd. (Total capital: 1.6 billion won)
10 Chungnam City Gas Project (Chungnam City Gas) - Concrete Coating
9 Won the Contract of Gori Nuclear Power Plant Unit 3 and 4 - PCCP
7 Won the Contract of Shin-Gori Nuclear Power Plant Unit 1 and 2 (Hyundai E&C) - PCCP
1 Increased capital by 1 billion won (Total capital: 1.5 billion won)
2005 12 Vietnam Rong Doi Project (Hyundai Corporation, KNOC) - Concrete Weight Coating
11 Main Pipeline of City Gas between Daegu~Tongyeong (Hyomyung Construction, KOGAS) - Concrete Coating
8 Obtained ISO 9001:2000 Certification
7 Vietnam Ho Chi Minh Sewage #8 Pumping Station Project (MOBIS) - Cement Lining
4 SK #2 Buoy Relocation Project (SK E&C) - Concrete Weight Coating
2004 12 America San Diego High Pressure Waterworks Project (San Diego City Hall) - Cement Coating
9 Acquired Patent of Impact Tester for Concrete Coating Pipe [Patent No.0451975]
9 Selected as a Gyeonggido's Promise Middle Corporation
4 Acquired Patent of Automatic Rotation System for Reinforced Concrete Pipe [Patent No.0430877]
2003 11 Acquired Patent of Automatic Rotation System for Steel Pipe [Patent No.0406229]
10 Acquired Patent of Manufacturing Method for Steel Pipe Coating Material [Patent No.0403207]
6 Acquired KS Mark Certificate - Pretensioned Spun PC Pole
6 Awarded Citation of the President of KORDI
[For contributing in construction of Ieodo Ocean Research Station]
6 Registered 3 utility models including Impact Tester for Gas Transporting Coating Pipe (0287621)
5 Registered utility model of Armature for Joint of Marine Gas Pipe (0261453)
2002 12 Acquired KS Mark Certificate - Centrifugal Force Reinforced Concrete Pipe
12 Acquired KS Mark Certificate - Free Tension Type Centrifugal Force High Strength Concrete Post
12 Acquired KS Mark Certificate - Core Type Prestressed Concrete Pipe
12 Acquired KS Mark Certificate - Prestressed Concrete Cylinder Pipe
9 Registered utility model of Synthetic Resins Coating Surface Peeler Tester for Concrete Coating Pipe [Registered Utility Model No.20-0291431]
7 Acquired Quality System Certificate (KS 9001:2000 / ISO 9001:2000)
3 Donghae-1 Gas Station's Gas Pipe Project (Hyundai Heavy Industries))
2001 12 Increased capital by 500 million won
12 Ieodo Ocean Research Station Project of KORDI
6 Developed Manufacturing and Installation System for Underwater Gas Pipeline
1998 3 Changed the Company's Name to Buyang Industrial Co., Ltd.
1994 4 Founded HENIKWON Joint Venture Company in Malaysia
1977 7 Founded Kunyang Concrete Co., Ltd.